Miscellaneous Correspondence File. File relates to Shaft S2-S4 Tunnel construction: Core Probing, reported delays, core drilling, blasting procedures, contract method statements, as built construction programmes and shield launch chamber. Also includes extracts from a response to claim volume 2b and internal report volume 2a part 2: technical issues.
Reference: D/AL/C5/A/16/18
Date: 26 May 1994 - 31 July 1995
Miscellaneous Balfour Beatty Correspondence File. File relates to performance monitoring for the slurry tunneling machine specification, tender contracts and meeting notes
Reference: D/AL/C5/A/16/19
Date: 26 November 1993 - 31 July 1995
Main Access Tunnel Claim Submission - Blasting Working File. GRM Personal File - includes fan, control, pump rooms, EESA, EES and vent shaft. This file is divided into headings; Main Body Contentions, Appendix 10, NTNU, Vibrock, Blast Summaries, Tender Correspondence, Contract Correspondence and Blast Records Summary.
Reference: D/AL/C5/A/16/40
Date: 31 March 1994 - 4 July 2000
Main Access Tunnel - GRM working file. File is divided into headings; Internal, Correspondence, Non-Technical Principles, Tech Reports, Tables and Sketches, Appendix 10 Blasting, MAT Causative Events and Appendix 10 Rock Properties. File is made up of correspondence, schedules, reports, data tables and reviews
Reference: D/AL/C5/A/16/41
Date: 28 April 1999 - 4 September 2000
Contractual Claims on Blasting: Review Summary. Report prepared by M. Sc. Bjorn Velken of NTNU - Department of Building and Construction Engineering
Reference: D/AL/C5/A/16/48/1
Date: 9 May 2000 - 5 February 2001
Contractual Claims on Blasting: Review Contractor's Claim. Report prepared by M. Sc. Bjorn Velken of NTNU - Department of Building and Construction Engineering
Reference: D/AL/C5/A/16/48/3
Date: 9 May 2000
Contractual Claims on Blasting: Review Working Group Reports. Report prepared by M. Sc. Bjorn Velken of NTNU - Department of Building and Construction Engineering
Reference: D/AL/C5/A/16/48/5
Date: 9 May 2000
Contractual Claims on Blasting: Initial Review. Report prepared by M. Sc. Bjorn Velken for NTNU along with covering letter
Reference: D/AL/C5/A/16/48/8
Date: 7 February 2000
Contractual Claims on Blasting: Initial Review. Draft Report prepared by M. Sc. Bjorn Velken for NTNU along with covering fax
Reference: D/AL/C5/A/16/48/10
Date: 2 September 1999
Rock Environmental Limited - Blasting Impact Assessment. Surface Water Link Tunnel, St Helier, Jersey for Donaldson Associates Limited on behalf of States of Jersey, Public Services Department
Reference: D/AL/C5/A/16/48/11
Date: 5 December 1992 - 16 December 1992
Correspondence papers between NTNU, Public Services Department and Vibrock including Vibrock critiques of SubTerra Engineering report concerning Shaft S2, monitoring locations and levels, contractual claims on blasting: review brief, correspondence logs, Figure 3a relating to peak particle velocity and scaled distance along with a floppy disk of Shaft S2 data
Reference: D/AL/C5/A/16/48/12
Date: 8 April 1998 - 30 August 1999
Vibrock Report Concerning Contractual Claim on Blasting: Cavern on behalf of Public Services Department
Reference: D/AL/C5/A/16/49/1
Date: 7 August 2000
Vibrock Report Concerning Critique of Claim Documentation with reference to: Cavern and Blast Induced Vibration on behalf of Public Services Department
Reference: D/AL/C5/A/16/49/4
Date: 7 August 2000
Vibrock Draft Report on Blasting Operations Associated with Cavern Excavation for States of Jersey
Reference: D/AL/C5/A/16/49/10
Date: 15 August 1997
Superseeded Vibrock Report concerning contractual claim on Blasting for States of Jersey. For newer draft of report please see the report dated 07/08/2000
Reference: D/AL/C5/A/16/49/11
Date: 22 October 1999
States of Jersey Public Services Department. Contract 520/2 Shaft 2 Working File. File includes; Response to the Shaft S2 Claim Submission; Draft for Internal Review, Technical Reports, Summaries of Causative Events, general correspondence, hydrogeology correspondence and blasting data.
Reference: D/AL/C5/A/17/26
Date: 3 June 1999 - 9 February 2001
Vibrock report concerning contractual claim on blasting - Shaft 2 on behalf of Public Services Department
Reference: D/AL/C5/A/17/29/1
Date: 12 August 1999