Fields 121 and 122 St John: Rezoning for Storage of Concrete Products, lodged by the Island Development Committee.
Reference: C/A616/1986/P6
Date: 14 January 1986
Fort Regent Cavern. Construction Phase 941101-D. Technical - Design Voume Twelve. Final Linings Concrete - General. File relates to general correspondence and includes cavern lining designs, formwork brochures, placement, preparation, method statements, aggregate suitability, elevation and cross section drawings, photographs of panels and related work records
Reference: D/AL/C5/D/12/18
Date: 22 July 1994 - 14 August 1996
Fort Regent Cavern. Construction Phase 941101-D. Technical - Design Voume Thirteen. Final Linings. File relates to correspondence on portals, tunnels, vent- control station, shafts and the cavern. Correspondence includes details on cavern lining designs, ventilation control, internal memos on designs, site information requests, notes on drawings, shotcrete, reinforcements, status reviews, drawings, pressure relief system, polypipe sales brochures, structural concrete and related work records
Reference: D/AL/C5/D/12/19
Date: 9 August 1994 - 25 July 1996
Fort Regent Cavern. Construction Phase 941101-D. Technical - Design Voume Fourteen A. Mechanical Steelwork. File relates to correspondence and details of anchoring, escape shaft, sump access and manhole drawings, fixings, staircases, runways, Cavern GRP (Glass Reinforced plastic) and results of computer analysis from SEADS and related work records and drawings
Reference: D/AL/C5/D/12/20
Date: 29 September 1994 - 30 September 1996
Fort Regent Cavern. Construction Phase 941101-D. Technical - Design Voume Fourteen B. Mechanical Steelwork. File relates to correspondence and details of anchoring, escape shaft, sump access and manhole drawings, fixings, staircase stability, runways, Cavern GRP (Glass Reinforced plastic) and results of computer analysis from SEADS and related work records and drawings
Reference: D/AL/C5/D/12/21
Date: 1 October 1996 - 7 April 1997
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Progress Records General. Volume Two - Weekly Reports June 1994 to December 1995. File includes weekly reports on cavern works such as drilling, blasting, shotcrete, support, concrete work, geotechnical, environmental monitoring and delays along with charts and figures. File also includes construction review from Geo-Engineering on the Main Access Tunnel, a technical note on S2 shotcrete requirements and design notes.
Reference: D/AL/C5/D/12/29
Date: 1 June 1994 - 30 December 1995
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Progress Records General. Volume Two - Weekly Reports Jan 1996 onwards. File includes weekly reports on cavern works such as drilling, blasting, shotcrete, support, concrete work, geotechnical, environmental monitoring and delays along with charts and figures.
Reference: D/AL/C5/D/12/30
Date: 1 January 1996 - 28 March 1997
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Shafts (Lining Phase). Volume Seven. File includes correspondence relating to escape shaft enclosure, information requests, method statements, pump shaft lining, bar schedules, concreting, Sandberg report on microscopical examination of concrete samples, working hours, meva panel system plan and other general site correspondence.
Reference: D/AL/C5/D/12/41
Date: 25 April 1995 - 24 February 1997
Fort Regent Cavern - Construction Phase. 941101-L. Construction - Contractual. Volume Three (B) - Monthly Quantities. File includes monthly quantities analysis, rock reinforcement layouts, shotcrete and concrete measuements.
Reference: D/AL/C5/D/12/65
Date: 17 May 1994 - 6 December 1996
Fort Regent Cavern - Public Services Department and Balfour Beatty concreting record sheets, pre post concrete check lists and concrete site control forms. Also includes pro forma documents
Reference: D/AL/C5/D/12/72
Date: 29 January 1996 - 11 November 1996
Fort Regent Cavern - Public Services Department and Balfour Beatty concreting record sheets, pre post concrete check lists and concrete site control forms for the Cavern, Pump Shaft and Control Room. As well as pump shaft sectional records
Reference: D/AL/C5/D/12/73
Date: 23 November 1995 - 5 November 1996
File includes; British Standard Specification for Scheduling, Dimensioning, Bending and Cutting of Steel Reinforcement for Concrete as well as techincal drawings and record sheets relating to space requirements, civil works, layouts, pipeworks, profiles, arrangements, coordinates and specifications.
Reference: D/AL/C5/D/13/1
Date: May 1993 - 15 May 1996
Weekly Reports from Week 100 to Week 147. Files includes Public Services Department weekly reports on cavern works including concrete work, shotcrete, GRP Works, Health and Safety, Breakdown and Delays and General notes. Also includes some drawn plans and progress charts
Reference: D/AL/C5/D/13/38
Date: 18 March 1996 - 15 February 1997
Weekly Reports from Week 100 to Week 147. Files includes Public Services Department weekly reports on cavern works including drill and blast, support, concrete work, shotcrete, GRP Works, Health and Safety, Breakdown and Delays and General notes. Also includes some drawn plans and progress charts
Reference: D/AL/C5/D/13/39
Date: 27 June 1994 - 16 March 1996
Fort Regent Cavern - Draft Construction Report. Cavern Works - Concrete Lining. Includes appendices 1 - 6.
Reference: D/AL/C5/F/19/6
Date: 25 September 1996 - April 1997
Bundle of Copy documents relating to Balfour Beatty claim. File includes correspondence, drawings, reports and work records relating to; end wall supports, cabling, delays, overbreak infilling, concreting, measurements, main holding tank rock reinforcement, final accounts, addendum item submissions, cavern design, blasting data and general construction
Reference: D/AL/C5/K/24/12
Date: 11 February 1994 - 20 November 1999
Concrete & Grout & Concrete Linings File. File includes cross section drawing showing excavation profile and general arrangement, comments from consulting engineers on rock connector systems, site information requests regarding concreting and observations on floor and wall concreting trials. File also includes a leaflet on Fibrin ''23''.
Reference: D/AL/C5/K/24/23
Date: 30 April 1994 - 24 August 1995
Bundle of copy correspondence. File includes; schedule of condition of properties, Balfour Beatty convergence monitoring records, extensometer monitoring records, piezometer monitoring records, cavern load cells, work records, drawings of concrete pours, anchor trials and instrumentation, shift reports and blasting sheets.
Reference: D/AL/C5/K/24/26
Date: 11 July 1994 - 1 April 1997
Fort Regent Cavern Excavation - Sandberg Consulting Engineers Assessment of rock for use as aggregate for concrete.
Reference: D/AL/C5/K/24/46
Date: 9 January 1995 - 16 February 1995