Showing 1 to 20 of 1,414 for
Claim Review Documents
Reference: D/AL/C5/A
Contract documentation; Listed Correspondence (File 1 of 2). Includes; the agreement of details of tender for the project made up of correspondence from Balfour Beatty and Public Services Department as well as meeting notes.
Reference: D/AL/C5/A/1/2
Date: 20 September 1993 - 31 March 1994
Contract documentation; Listed Correspondence (File 2 of 2). Includes; the agreement of details of tender for the Cavern project made up of correspondence from Balfour Beatty and Public Services Department as well as meeting notes, drawings, procedures and product descriptions.
Reference: D/AL/C5/A/1/3
Date: 20 September 1993 - 31 March 1994
Contract documentation; Conditions of Contract; Specification; Bills of Quantities and Form of Tender for the Tunnel Works and Storage Tank.
Reference: D/AL/C5/A/1/4
Date: July 1993
St Helier Surface Water Link and Storage Tank. Fort Regent; Cavern. Assessment of Structural Geology and Hydrogeology - Evaluation of Rock Mass Properties. Volume 1.
Reference: D/AL/C5/A/1/5B/8
Date: August 1993
St Helier Surface Water Link and Storage Tank. Fort Regent; Cavern. Assessment of Structural Geology and Hydrogeology - Evaluation of Rock Mass Properties. Volume 2.
Reference: D/AL/C5/A/1/5B/9
Date: August 1993
Public Services Department report on the Main Drainage Section - Specification for Storage Tank.
Reference: D/AL/C5/A/1/6/3
Date: July 1993
File relates to a report on the Fort Regent Storage Tank. Civil Engineering - Underground Works. Outline description of underground works; Key Components; Layout Principles; Construction Procedures and Stabilisation Measures. List of Drawings; Drawings - Details of Cavern Arrangement.
Reference: D/AL/C5/A/1/8/1
Date: July 1993
Water Link and Storage Tank Contract 520/2. Construction. Chronological Correspondence from Balfour Beatty (0001-0061) File No. 1
Reference: D/AL/C5/A/1/9
Date: 1 April 1994 - 30 June 1994
Water Link and Storage Tank Contract 520/2. Construction. Chronological Correspondence from Balfour Beatty (0066-0189) File No. 2
Reference: D/AL/C5/A/1/10
Date: 1 July 1994 - 29 July 1994
Water Link and Storage Tank Contract 520/2. Construction. Chronological Correspondence from Balfour Beatty (0192-0265) File No. 3
Reference: D/AL/C5/A/1/11
Date: 1 August 1994 - 19 August 1994
Water Link and Storage Tank Contract 520/2. Construction. Chronological Correspondence from Balfour Beatty (0262-0377) File No. 4
Reference: D/AL/C5/A/1/12
Date: 19 August 1994 - 11 October 1994
Water Link and Storage Tank Contract 520/2. Construction. Chronological Correspondence from Balfour Beatty (0378-0458) File No. 5
Reference: D/AL/C5/A/1/13
Date: 12 October 1994 - 8 November 1994