Showing 1 to 20 of 147 for
Notice concerning the introduction of metric measurement
Reference: B/A/W30/81
Date: 27 February 1942
Fort Regent Cavern - Construction Phase. 941101-L. Construction - Contractual. Volume One (A) - General Correspondence. File includes correspondence relating to final measurement programmes, meeting notes, rates of works, additional works, claims, valuations, time and motion study, site instructions, disruptions and delays.
Reference: D/AL/C5/D/12/59
Date: 6 May 1994 - 31 May 1996
Fort Regent Cavern - Construction Phase. 941101-L. Construction - Contractual. Volume One (B) - General Correspondence. File includes correspondence relating to junction boxes, labour rates, meeting notes, bill submissions, measurement progress, defects, cross section drawings of the cavern, geological overbreak, claims, sectional completion, prolongation costs and contractual issues.
Reference: D/AL/C5/D/12/60
Date: 12 June 1996 - 4 August 1998
Surface Water Link and Storage Tank Contract No 520/2. Final Account Dimensions and Final Account Measurements. Sections 1-6. These sections relate to General Items, S1-S2, S2-S4, S1-S5, Shaft 1 and Shaft 2
Reference: D/AL/C5/E/18/12
Date: 30 October 1995 - October 1998
Surface Water Link and Storage Tank Contract No 520/2. Final Account Dimensions and Final Account Measurements. Sections 9-12. These sections relate to Shaft 4, MHS5, S2-MHT.
Reference: D/AL/C5/E/18/13
Date: April 1993 - 3 September 1997
Surface Water Link and Storage Tank Contract No 520/2. Final Account Dimensions and Final Account Measurements. Sections 13-21
Reference: D/AL/C5/E/18/14
Date: 21 November 1996 - August 1997
Surface Water Link and Storage Tank Contract No 520/2. Rock Reinforcement. File includes correspondence, work records and file notes relating to Rockbolts, Rock Reinforcement claim, support requirements and measurements.
Reference: D/AL/C5/E/18/18
Date: 19 July 1994 - 30 May 2001
Jersey Storm Water Project: Re-Measure of the Works. Balfour Beatty Measure Sheets removed, checked, copied etc and used elsewhere except thise inside. See notes on dividers regarding Shaft 1 and Shaft 4 - Revised. File includes drawings and final account measurements
Reference: D/AL/C5/E/18/21
Date: 17 March 1997 - 7 September 1997
Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank. Contract 520/2. Copy of correspondence between Public Services Department and Balfour Beatty regarding Final Measurement of Works. CRC File No 1
Reference: D/AL/C5/E/18/22
Date: 6 December 1996 - 12 November 1998
Explanatory Notes for Budget Exercise - Projected Final Measurement Value with covering note.
Reference: D/AL/C5/H/22/11/3
Date: 9 March 1999 - 11 March 1999
Assessment of Delay, Prolongation relating to Main Access Tunnel, Tunnel S1-S2 and Main Holding Tank. File also includes paperwork titled critical events to cavern section and overall programme critical events.
Reference: D/AL/C5/H/22/11/4
Date: 12 March 1999 - 16 March 1999
Bundle of Copy documents relating to Balfour Beatty claim. File includes correspondence, drawings, reports and work records relating to; end wall supports, cabling, delays, overbreak infilling, concreting, measurements, main holding tank rock reinforcement, final accounts, addendum item submissions, cavern design, blasting data and general construction
Reference: D/AL/C5/K/24/12
Date: 11 February 1994 - 20 November 1999
File of copy drawings including; layouts, dimensions, setouts, surveys, electrical layouts, civil works, plans, pipework details, manholes, traffic diversion maps and specifications. File also includes drawing issue sheets and bar bending dimensions.
Reference: D/AL/C5/K/24/13
Date: May 1993 - December 1995
B0025 Jersey - Final Account. Measurement and Rates. Trials and Testing Instrumentation. Bill 1. Preliminaries from 1/1/16/0138-1/1/16/0150. File No M/01/05
Reference: D/AL/C5/N/26
Date: 1994 - 1998
B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; Bill Measure and Section Summary. File No M/02/01
Reference: D/AL/C5/N/27
Date: 1994 - 1998
B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; A I's 1-19. File No M/02/02
Reference: D/AL/C5/N/28
Date: 1994 - 1998
B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; A I's 20-39. File No M/02/03
Reference: D/AL/C5/N/29
Date: 1994 - 1997
B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; A I's 40-59. File No M/02/04
Reference: D/AL/C5/N/30
Date: 1994 - 1997
B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; A I's 60-66. File No M/02/05
Reference: D/AL/C5/N/31
Date: 1994 - 1997
B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; A I's 67-72. File No M/02/06
Reference: D/AL/C5/N/32
Date: 1994 - 1998