Showing 1 to 20 of 699 for
Bailiffs correspondence file regarding security of records [folder contains multiple files catalogued individually]
Reference: B/D/A/M7 (940)
Date: 6 June 2001 - 24 July 2001
Proposition to Record Meetings of States Assembly, lodged by Deputy J P Sandeman of St Helier
Reference: C/A607/1977/P16
Date: 1 March 1977
Proposition Regarding the written recording of meetings of the States, lodged by Deputy J P Sandeman of St Helier
Reference: C/A608/1978/P12
Date: 24 January 1978
Personnel records of William Reginald Toy. Includes salary or wages (1933-1966), late attendances (1947-1957), absence record (1938-1963), leave record (1964-1966).
Reference: D/AE/B5/6/1
Date: 1933 - October 1966
Contract 520/2. Claim S1-S2 Technical Appraisal. File includes; actions for working group meetings, strength testing results, RQD results, geotechnical logging records, test certificates, project area plans and graphs on scanlines, cores, rates and RQD and records on water inflow.
Reference: D/AL/C5/A/15/20
Date: 30 April 1994 - 5 March 1999
States of Jersey Public Services Department. Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank Contract 520/2. Submission of further and better particulars to substantiate the contractor's entitlement to delay and/or disruption and/or additional payments. Tunnel MHS1 to MHS2 - Appendix 19 to 25.
Reference: D/AL/C5/A/15/21
Date: 11 April 1996 - 16 July 1998
Fort Regent Cavern. Construction Phase 941101-D. Technical - Design Voume Thirteen. Final Linings. File relates to correspondence on portals, tunnels, vent- control station, shafts and the cavern. Correspondence includes details on cavern lining designs, ventilation control, internal memos on designs, site information requests, notes on drawings, shotcrete, reinforcements, status reviews, drawings, pressure relief system, polypipe sales brochures, structural concrete and related work records
Reference: D/AL/C5/D/12/19
Date: 9 August 1994 - 25 July 1996
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Portals. Volume Three. File includes correspondence about portals, method statements and related Balfour Beatty work records.
Reference: D/AL/C5/D/12/31
Date: 16 May 1994 - 9 December 1996
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Tunnels (Excavation Phase) - MAT to CH39, MAT CH39 to end, Turning Bay and Emergency Escape Adit. Volume Four. File includes well depth data, method statements, Balfour Beatty work records, site information requests and related correspondence.
Reference: D/AL/C5/D/12/32
Date: 19 July 1994 - 16 November 1994
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Tunnels (Lining Phase). Volume Four. File includes correspondence about shotcrete trials, waterproofing, chainage, Balfour Beatty work records and related correspondence.
Reference: D/AL/C5/D/12/33
Date: 7 February 1995 - 29 January 1997
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Vent-Control Stations (Lining Phase). Volume Five. File includes correspondence about shotcrete trials, waterproofing, ventilation, general construction and design issues, Balfour Beatty work records and related correspondence.
Reference: D/AL/C5/D/12/34
Date: 19 August 1994 - 21 January 1997
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Vent-Control Stations (Excavation Phase) - Pump and Control Room. Volume Five (I). File includes correspondence about installing units, excavation, profile drawings, method statements, Balfour Beatty work records and related correspondence.
Reference: D/AL/C5/D/12/35
Date: 12 August 1994 - 6 April 1995
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Vent-Control Stations (Excavation Phase) - Fan Room. Volume Five (II). File includes correspondence about shotcrete, half barrel records, structural issues, profiles, backfilling, method statements, Balfour Beatty work records, requests for information, stability assessments, rock bolt surveys, photographs of pad inspections and related correspondence and plans.
Reference: D/AL/C5/D/12/36
Date: 16 February 1995 - 2 August 1995
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Blasting Trial and Survey. Volume Eight (B). File includes correspondence relating to Pump and Control Room and Main Access Tunnel Blasting Trials, proposed blast patterns and readings, site records, site information requests, vibration and noise monitoring, project surveys on completed excavations.
Reference: D/AL/C5/D/12/44
Date: 16 June 1994 - 19 September 1994
Fort Regent Cavern - Construction Phase. 941101-G. Construction Site Records - Excavation; General. Volume One (A). Blasting Patterns, Portals, Tunnels and Vent - Control. File includes proposed blast drilling and charging patterns, previous blast records, daily reports, drill and blast activity bar charts and work records.
Reference: D/AL/C5/D/12/47
Date: 9 July 1994 - 18 November 1996
Fort Regent Cavern - Construction Phase. 941101-G. Construction Site Records - Excavation; General. Volume One (B). Blasting Patterns, Cavern and Shafts. File includes proposed blast drilling and charging patterns, previous blast records, daily reports and work records.
Reference: D/AL/C5/D/12/48
Date: 6 January 1994 - 2 September 1996
Fort Regent Cavern - Construction Phase. 941101-G. Construction Site Records - Excavation. Volume Two. Profiles, Fan Room, Main AccessTunnel and Pump Shaft. File includes profile records, work records, survey data, underbreak and overbreak reports and general site corresondence.
Reference: D/AL/C5/D/12/49
Date: 1 September 1994 - 29 March 1996
Fort Regent Cavern - Construction Phase. 941101-G. Construction Site Records - Excavation. Volume Two. Profiles - Cavern. File includes profile records, work records, survey data and general site corresondence.
Reference: D/AL/C5/D/12/50
Date: 2 February 1994 - 16 September 1996
Fort Regent Cavern - Construction Phase. 941101-G. Construction Site Records - Excavation. Volume Two (B). Profiles - Final Lining. File includes profile plots and records, shotcrete profiles, work records, survey data, longitudinal surveys and rock anchor headplate positions.
Reference: D/AL/C5/D/12/51
Date: 30 March 1995 - 4 July 1995
Fort Regent Cavern - Construction Phase. 941101-G. Construction Site Records - Main Access Tunnel. Half Barrel and Overbreak Records. Volume Five. File includes site records of survey data and plots for the Main Access Tunnel, Turning Bay Area, Emergency Escape Adit
Reference: D/AL/C5/D/12/54
Date: 1 September 1994 - 20 January 1997