Comments

Weighbridge to Town Centre, St Helier Surface Water Link and Storage Tank. Tunnel - Shaft 1 to Shaft 2 - Horizontal Raisebore. Assessment of delays claimed by the contractor during backreaming. Volume Two. File includes completed Balfour Beatty shift reports with some covering notes throughout

Reference

D/AL/C5/A/15/15

Date

1998-12 - 1998-12

Names

Fort Regent
Balfour Beatty Limited
Public Services Department

Keywords

Cavern | Contract 520 | Construction | Geology | Surface Water Drainage | Storage Tank | Weighbridge | claims | Correspondence | Shaft | reports

Dimensions

2 File

Level of description

file

Access Restriction

Exempt from Public Access under FOI regulations – contact FOI@gov.je to review.

Closed until

2029-12

Context:

D/AL/C5/A/15/15This item»
Search query time: 0 seconds • Page build time: 0.0088250160217285 seconds