Comments

Weighbridge to Town Centre, St Helier Surface Water Link and Storage Tank Contract No 520/2. Chief Resident Engineer's Report to the Engineer - Report on Balfour Beatty's Submission on the Scott Schedule [No reference provided on this file - given next reference code in sequence]

Reference

D/AL/C5/A/17/48

Date

June 4th 2001 - June 4th 2001

Names

Fort Regent
Public Services Department
Balfour Beatty Limited

Keywords

Cavern | Contract 520 | Construction | Geology | Surface Water Drainage | Storage Tank | Weighbridge | Shaft | schedules

Dimensions

1 File

Level of description

file

Access Restriction

Exempt from Public Access under FOI regulations – contact FOI@gov.je to review.

Closed until

June 4th 2032

Context:

D/AL/C5/A/17/48This item»
Search query time: 0 seconds • Page build time: 0.0094221154848735 seconds