Showing 1 to 20 of 1718 for GeologyX
Geological examination of German Tunnels by Dr. A E Mourant, 51, Oakley Gardens, Chelsea, London, SW3
Reference: B/A/L4/3/4
Date: August 9th 1946 - August 14th 1946
St Helier Surface Water Link and Storage Tank. Fort Regent; Cavern. Assessment of Structural Geology and Hydrogeology - Evaluation of Rock Mass Properties. Volume 1.
Reference: D/AL/C5/A/1/5B/8
Date: 1993-08 - 1993-08
St Helier Surface Water Link and Storage Tank. Fort Regent; Cavern. Assessment of Structural Geology and Hydrogeology - Evaluation of Rock Mass Properties. Volume 2.
Reference: D/AL/C5/A/1/5B/9
Date: 1993-08 - 1993-08
File relating to Geological Construction Records; Summary of Available Information concerning Tunnel S1-S2 and S2-S4.
Reference: D/AL/C5/A/1/7/4
Date: September 30th 1998 - September 30th 1998
Geologists' Association Guide to the Geology of Jersey (No 41)
Reference: D/AL/C5/A/1/7/5
Date: 1981 - 1981
This file is a photocopy of the booklet: British Geological Survey: Classical Areas of British Geology - Jersey.
Reference: D/AL/C5/A/1/7/6
Date: 1989 - 1989
A copy of the article - 'The Geology of the Fort Regent Road Tunnel' by J.T. Renouf and A.C. Bishop
Reference: D/AL/C5/A/1/7/7
Date: 1971 - 1971
S1-S2 Arthur Reeve (AR) Working File. File includes; core drilling progress data, programmes of works, assessments of causative events, logs of incoming and outgoing correspondence and claim documentation.
Reference: D/AL/C5/A/15/1
Date: June 30th 1995 - June 28th 1999
Water Link and Storage Tank; Contract No 520/2. Claim Review Administration - Tunnel S1-S2. File includes; general internal correspondence, records, accounts, claim documentation, work group meeting correspondence, claim appraisal records and submissions of further and better particulars.
Reference: D/AL/C5/A/15/10
Date: July 28th 1998 - May 4th 1999
Water Link and Storage Tank; Contract No 520/2. Internal review and report of BBCEL claim submission. Claim S1-S2. File includes correspondence relating to; causative delay events,incoming and outgoing correspondence records, claim submission reviews and consultant analysis and report on lining items.
Reference: D/AL/C5/A/15/11
Date: September 3rd 1998 - May 8th 1999
Merricks Rupert Cowen Horizontal Raise Bore S1-S2 States of Jersey. File includes; daily diaries, history of site events, site information requests, accounts, meeting notes and general correspondence relating to horizontal raiseboring and core drilling
Reference: D/AL/C5/A/15/12
Date: October 17th 1994 - April 15th 1996
Appraisal of the contractor's claim; Excessive Radon in the Workplace - P Wilkinson. File includes; claims team appraisal, Balfour Beatty claim, site investigation report, BGS report, John Knill report, D Dixon report, letters to and from the contractor, diagrams, case study and ventilation calculations.
Reference: D/AL/C5/A/15/13
Date: June 3rd 1993 - September 10th 1998
Weighbridge to Town Centre, St Helier Surface Water Link and Storage Tank. Tunnel - Shaft 1 to Shaft 2 - Horizontal Raisebore. Assessment of delays claimed by the contractor during backreaming. Volume One. file includes schedules of events, event summaries, analysis, shift comments and reports
Reference: D/AL/C5/A/15/14
Date: 1998-12 - 1998-12
Weighbridge to Town Centre, St Helier Surface Water Link and Storage Tank. Tunnel - Shaft 1 to Shaft 2 - Horizontal Raisebore. Assessment of delays claimed by the contractor during backreaming. Volume Two. File includes completed Balfour Beatty shift reports with some covering notes throughout
Reference: D/AL/C5/A/15/15
Date: 1998-12 - 1998-12
Water Link and Storage Tank Contract 520/2. Further Particulars provided by Balfour Beatty on 18 November 1998 - responding in part to letter 520/2/C34/30/4470.
Reference: D/AL/C5/A/15/16
Date: November 29th 1994 - November 10th 1998
Tunnel S1-S2 Claim. Supplement to Appendix 20. Referenced documents listed in Section 7. File includes; articles, book extracts and reports
Reference: D/AL/C5/A/15/17
Date: November 11th 1994 - November 11th 1998
Water Link and Storage Tank Contract 520/2. Drillcon's Daily Reports submitted as further particulars on 18 November 1998 in response to letter 520/2/C34/30/4464. File includes copies of daily reports
Reference: D/AL/C5/A/15/18
Date: November 11th 1994 - November 11th 1998
St Helier Surface Water Link and Storage. SubTerra Engineering Ltd Horizontal Raise Bore Geotechnical drawings, charts, graphs and progress rates.
Reference: D/AL/C5/A/15/19
Date: March 9th 1998 - April 30th 1998