Weighbridge to Town Centre, St Helier Surface Water Link and Storage Tank - Contract 520/2. Horizontal Raise Bore. Assessment of Contractor's Claims. Sub Terra Engineering Expert Report. Appendix 20: Horizontal Raisebore Production outputs along with covering correspondence

Reference: D/AL/C5/A/15/44/10

Date: January 10th 1999 - March 8th 1999

Articles relating to research for the cavern project. File includes; The Kielder experimental tunnel: final results and Sprayed Concrete: Tunnel Support Requirements and the dry mix process

Reference: D/AL/C5/A/15/44/11

Date: 1983 - 1983

Weighbridge to Town Centre, St Helier Surface Water Link and Storage Tank - Contract 520/2. Working Group Four Appendix 20 Critique Report - Tunnel S1-S2 claim.

Reference: D/AL/C5/A/15/44/4

Date: September 27th 1999 - September 27th 1999

Weighbridge to Town Centre, St Helier Surface Water Link and Storage Tank - Contract 520/2. Tunnel S1-S2 Claim. Evaluation of Effects Draft Issue along with covering email

Reference: D/AL/C5/A/15/44/5

Date: August 8th 1999 - August 8th 1999

Weighbridge to Town Centre, St Helier Surface Water Link and Storage Tank - Contract 520/2. Tunnel S1-S2 Claim. Evaluation of Effects Revised Draft Issue along with covering email

Reference: D/AL/C5/A/15/44/6

Date: September 9th 1999 - September 9th 1999

Weighbridge to Town Centre, St Helier Surface Water Link and Storage Tank - Contract 520/2. Tunnel S1-S2 Claim. Evaluation of Effects draft chapter on coring, for checking along with covering email

Reference: D/AL/C5/A/15/44/7

Date: August 18th 1999 - August 18th 1999

Weighbridge to Town Centre, St Helier Surface Water Link and Storage Tank - Contract 520/2. Tunnel S1-S2 Claim. Evaluation of Effects draft chapter on pilot hole drilling, for checking along with covering email

Reference: D/AL/C5/A/15/44/8

Date: August 22nd 1999 - August 22nd 1999

Weighbridge to Town Centre, St Helier Surface Water Link and Storage Tank - Contract 520/2. Tunnel S1-S2 Claim. Evaluation of Effects draft chapter on back reaming, for checking along with covering email

Reference: D/AL/C5/A/15/44/9

Date: September 1st 1999 - September 1st 1999

Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank, Tunnel between MHS1 and MHS2. David Norbury review of Working Group One Report on Geology

Reference: D/AL/C5/A/15/45/1

Date: July 18th 1999 - July 18th 1999

Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank, Tunnel between MHS1 and MHS2. Working Group report on geology - review of draft report along with covering letter from Soil Mechanics

Reference: D/AL/C5/A/15/45/2

Date: 1999-07 - September 14th 1999

Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank, Tunnel between MHS1 and MHS2. Working Group report on Rock Material Properties - review of draft report

Reference: D/AL/C5/A/15/45/4

Date: 1999-08 - 1999-08

Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank, Tunnel between MHS1 and MHS2. Review of causative events on Horizontal Raisebore tunnel

Reference: D/AL/C5/A/15/45/5

Date: November 16th 1999 - November 16th 1999

Golder Associates review of causative events CD02, CD07, PH02 and BR03 - Groundwater Related. Version B.O along with report issue form

Reference: D/AL/C5/A/15/46/1

Date: September 24th 1999 - September 24th 1999

Golder Associates Assessment of the groundwater information available to bidders on the St Helier Surface Water Sewer Link Tunnel Project. Draft Version along with covering letter.

Reference: D/AL/C5/A/15/46/10

Date: November 30th 1998 - November 30th 1998

Golder Associates review of causative events CD02, CD07, PH02 and BR03 - Groundwater Related. Version D.O along with report issue form

Reference: D/AL/C5/A/15/46/2

Date: June 15th 1999 - June 15th 1999

Golder Associates review of causative events CD02, CD07, PH02 and BR03 - Groundwater Related. Version D.O along with report issue form, covering letter and summary

Reference: D/AL/C5/A/15/46/3

Date: June 16th 1999 - June 16th 1999

Golder Associates review of "Consensus Report" from the Working Group for Groundwater: Shaft S1 to Shaft S2 Claim, Groundwater Aspects. Version B.O along with report issue form, covering letter and correspondence.

Reference: D/AL/C5/A/15/46/4

Date: September 24th 1999 - October 21st 1999

Golder Associates review of "Consensus Report" from the Working Group for Groundwater: Shaft S1 to Shaft S2 Claim, Groundwater Aspects. Version D.O along with report issue form, covering letter and correspondence.

Reference: D/AL/C5/A/15/46/5

Date: May 7th 1999 - May 7th 1999