Golder Associates review of "Consensus Report" from the Working Group for Groundwater: Shaft S1 to Shaft S2 Claim, Groundwater Aspects. Version D.O along with a covering letter.

Reference: D/AL/C5/A/15/46/6

Date: May 3rd 1999 - May 4th 1999

Golder Associates St Helier Storm Water Tunnel: Comparison of SI based Hydrogeological Predictions and Encountered Conditions: Part One - Weighbridge to Shaft Two. Version A.O along with transmittal note and report issue form.

Reference: D/AL/C5/A/15/46/7

Date: September 24th 1999 - September 24th 1999

Golder Associates St Helier Storm Water Tunnel: Comparison of SI based Hydrogeological Predictions and Encountered Conditions: Part One - Weighbridge to Shaft Two. Version D.O (Draft) along with report issue form and covering letter.

Reference: D/AL/C5/A/15/46/8

Date: February 18th 1999 - February 18th 1999

Golder Associates Assessment of the groundwater information available to bidders on the St Helier Surface Water Sewer Link Tunnel Project. Version B.O along with report issue form and covering letter.

Reference: D/AL/C5/A/15/46/9

Date: December 10th 1998 - December 10th 1998

States of Jersey Public Services Department. Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank Contract 520/2. Submission of further and better particulars S1 to S2 tunnel section. DAL comments on section 2 and section 5 of contractor's submission along with covering correspondence.

Reference: D/AL/C5/A/15/48/1

Date: August 25th 1999 - August 25th 1999

St Helier Surface Water Link - Balfour Beatty Claim. Tunnel S1 - S2 - Review of Technical Issues by Geo Engineering along with covering correspondence

Reference: D/AL/C5/A/15/48/2

Date: January 5th 1999 - January 5th 1999

States of Jersey Public Services Department. Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank. Contract 520/2. Information sent to BBCEL under letter reference 520/2/C34/30/4712 dated 29th November 1999. Claim S1-S2 Response and Query BBCEL-007. File includes copies of cited technical references.

Reference: D/AL/C5/A/15/49

Date: November 29th 1999 - November 29th 1999

Surface Water Link and Storage Tank Contract 520/2. Appraisal of Contractor's Claims. Tunnel S1-S2; CRE's team final check and endorsement of draft response. 2 - Causative Events No LIN 1 - 5 and 8 - 10 and PW1 and 3 - 10.

Reference: D/AL/C5/A/15/5

Date: June 30th 1999 - July 9th 1999

Tunnel and Cavern - Balfour Beatty File One. File includes; transmission reports, meeting notes and general project correspondence relating to environmental concerns, blast designs, information requests, tender method statements, water ingress, surface settlement, instrument readings, construction methodology and tender details.

Reference: D/AL/C5/A/15/50

Date: October 5th 1993 - March 22nd 1994

Tunnel and Cavern - Balfour Beatty File Two - Construction General. File includes; drawing issue sheets, news articles and general project correspondence relating to delays, aggregates, sub-contractors. construction and development.

Reference: D/AL/C5/A/15/51

Date: March 23rd 1994 - August 5th 1994

File on Tunnel Six. File includes; news articles, contract agreements, office site plans, conversation records, meeting notes, Public Services Committee notes, drawings of town plans and general project correspondence relating to instrumentation, blast designs, environmental monitoring, rock disposal and tenders.

Reference: D/AL/C5/A/15/52

Date: November 26th 1993 - March 31st 1994

File on Tunnel Five. File includes; news articles, contract agreements, office site plans, conversation records, meeting notes, Public Services Committee notes, drawings of town plans and general project correspondence relating to instrumentation, progress reports, environmental monitoring, rock disposal and tenders.

Reference: D/AL/C5/A/15/53

Date: September 17th 1993 - December 31st 1993

File titled Balfour Beatty Civil Engineering Limited. This is a correspondence file relating to responses to items raise at meetings, environmental assessments, meeting notes, longitudinal section drawings, construction methodology, water ingress, surface settlement and groundwater. Also included is a copy of World Tunneling titled Norwegian Method of Tunneling.

Reference: D/AL/C5/A/15/54

Date: December 20th 1993 - February 11th 1994

Drill and Blast - Horizontal Raise Bore File One. File relates to HRB1, HRB2, D&B 1 and horizontal raisebore includes; as built construction programmes and supporting information, legal and contractual issues of tunnel S1 to S2, submissions of further and better particulars, internal review and report of Balfour Beatty's claim submission, method statements on tunnel excavation and delay analysis

Reference: D/AL/C5/A/15/55

Date: March 4th 1994 - 1999-04

Core Drilling Working File Two. File includes Core Drilling notified claims 1 - 12 and relates to further and better particulars for tunnel MHS1 to MHS2, horizontal raisebore techniques, programmes of works, delay identification, daily work reports and general project correspondence between Balfour Beatty and Public Department

Reference: D/AL/C5/A/15/56

Date: January 30th 1995 - 1996-03

Pilot Hole File Three. File relates to Pilot Hole Drilling notified claims PH 1 - 8 and includes correspondence on horizontal raisebore construction reports, submission of further and better particulars, schedules of events identifying delays, schedules of correspondence, activity bar charts, daily record sheets and reports

Reference: D/AL/C5/A/15/57

Date: September 28th 1994 - September 15th 1995

Back Reaming File Four. File relates to Back Reaming notified claims BR 1 - 9 and includes correspondence on 'as built' construction programmes, schedules, method statements, general correspondence, further and better particulars, schedules of events identifying delays, work records and reports

Reference: D/AL/C5/A/15/58

Date: August 18th 1995 - July 2nd 1998

Back Reaming File Five (2). File relates to Back Reaming notified claims BR 9 (F) - 16 and includes correspondence on 'as built' construction programmes, schedules, method statements, general correspondence, further and better particulars, schedules of events identifying delays, core descriptions, work records and reports

Reference: D/AL/C5/A/15/59

Date: August 18th 1995 - July 2nd 1998

Surface Water Link and Storage Tank Contract 520/2. Appraisal of Contractor's Claims. Tunnel S1-S2; CRE's team final check and endorsement of draft response. 3 - Causative Events No PH1 & 2 and BR3, 4 and 11.

Reference: D/AL/C5/A/15/6

Date: June 30th 1999 - July 12th 1999