Lining Works File Six. File relates to Lining Works notified claims Lin 1 - 10 and includes correspondence on further and better particulars, programme of works, schedule of events identifying delays, summary of delays, work records and general correspondence.

Reference: D/AL/C5/A/15/60

Date: December 5th 1996 - June 19th 1997

Pipework Installation File Seven. File relates to pipework installation notified claims PW 1 - 10 and includes correspondence on further and better particulars, programme of works, summary of delays, internal reviews, work records, drawings, reports, method statements and general correspondence.

Reference: D/AL/C5/A/15/61

Date: July 15th 1994 - June 3rd 1999

CRH personal file: Duplicate correspondence to and from Balfour Beatty. File includes a schedule of correspondence including titles and dates

Reference: D/AL/C5/A/15/62

Date: July 15th 1994 - March 20th 1997

MCC personal file: Duplicate Horizontal Raisebore correspondence to and from Balfour Beatty. File includes a schedule of correspondence including titles and dates

Reference: D/AL/C5/A/15/63

Date: July 15th 1994 - March 20th 1997

Computer Floppy Disk Titled; Jersey BB Claim S1-S2 - Appendices 9-18, 27-29, 32-34 inclusive [no date provided - estimated from surrounding documents]

Reference: D/AL/C5/A/15/64

Date: 1994 - 1997

States of Jersey Public Services Department. Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank Contract 520/2. Reply to Chief Resident Engineer's Response. Section - Tunnel S1 to S2 [No reference provided on this file - given next reference code in sequence]

Reference: D/AL/C5/A/15/65

Date: July 19th 2001 - July 19th 2001

Annotated notes in review of BBCEL Reply Document relating to - States of Jersey Public Services Department. Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank Contract 520/2. Reply to Chief Resident Engineer's Response. Section - Tunnel S1 to S2 [No reference provided on this file - given next reference code in sequence]

Reference: D/AL/C5/A/15/66

Date: August 29th 2001 - August 29th 2001

States of Jersey Public Services Department. Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank Contract 520/2. Section - Overall Delay and Disruption and Extension of Time Claims Submission. Reply to Chief Resident Engineer's Response. [No reference provided on this file - given next reference code in sequence]

Reference: D/AL/C5/A/15/67

Date: August 29th 2001 - August 29th 2001

Annotated copy of the Reply to Chief Resident Engineer's Response; Section - Main Access Tunnel and Associated Works - Volume One [No reference provided on this file - given next reference code in sequence]

Reference: D/AL/C5/A/15/68

Date: July 26th 2001 - July 26th 2001

Annotated copy of the Reply to Chief Resident Engineer's Response; Section - Main Access Tunnel and Associated Works - Volume Two [No reference provided on this file - given next reference code in sequence]

Reference: D/AL/C5/A/15/69

Date: July 26th 2001 - July 26th 2001

Surface Water Link and Storage Tank Contract 520/2. Claim S1-S2; CRE's assessment of delay.

Reference: D/AL/C5/A/15/7

Date: September 19th 1999 - September 19th 1999

Copy extracts of Balfour Beatty's submission of further and better particulars. Section - Tunnel MHS1 to MHS2. PH05D & B. Also includes; schedule of events identifying delays, programme of changing back to drill and blast and related correspondence.

Reference: D/AL/C5/A/15/8

Date: August 16th 1995 - 1999-03

Copy of sub contract agreement between Balfour Beatty and Drillcon for Horizontal Raise Boring.

Reference: D/AL/C5/A/15/9

Date: November 29th 1994 - November 29th 1994

States of Jersey Public Services Department. Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank Contract 520/2. Claim Submission S2-S4. Missing and Changed Information received on 01/02/00 BB ref.4717 dd 28/01/00 File One. Includes list of coins cost codes, Drillcon daily reports and allocation sheets.

Reference: D/AL/C5/A/16/1

Date: August 19th 1994 - February 1st 2000

S2-S4 Technical Reports and Causative Events - Working File. File relates to unforeseen physical conditions, compressive strength data, progress reviews, reports by engineers, assessments of causative events, diagrams, data, proposed blast patterns, daily reports and general correspondence.

Reference: D/AL/C5/A/16/10

Date: January 13th 1994 - January 18th 1997

S2-S4 Working File - Guy R Metzger. File relates to event programmes, summary of causative events, general claims correspondence, Working Group notes on Groundwater tender, rock material properties and geology, review reports, critique reports on appedices, rock testing certificates and replies to this correspondence file.

Reference: D/AL/C5/A/16/11

Date: January 13th 1994 - December 4th 2000

S2-S4 Main Body Sections 4, 5 & 6. File includes contents pages on what is included in each section of the submission of further and better particulars - Tunnel MHS2-MHS4. [No date given so dates assumed from details within the file]

Reference: D/AL/C5/A/16/12

Date: 1994 - 1996

S2-S4 Technical Reports Appendix 10 & 12. Includes; Appendix 10 - SubTerra Engineering Report - Technical Basis of Claim for Unseen Physical Conditions and Appendix 12 - Geotechnical Consulting Group Expert Report - Ground Water Ingress during TBM interventions Shaft 2 to Shaft 4

Reference: D/AL/C5/A/16/13

Date: 1998-10 - 1998-10

Surface Water Link and Storage Tank - Response to Tunnel S2-S4 Claim Submission. Includes some annotations by engineers.

Reference: D/AL/C5/A/16/14

Date: November 14th 1994 - January 26th 2000

Surface Water Link and Storage Tank - Response to Tunnel S2-S4 Claim Submission - Internal Review - MCC copy

Reference: D/AL/C5/A/16/15

Date: May 17th 2000 - May 17th 2000

Search query time: 0.1406288 seconds • Page build time: 0.0074173013369242 seconds