Showing 1 to 20 of 174 for TunnelsX
Plans of the German tunnels at the German Underground Hospital
Reference: D/AL/A6/2318/1(C5)
Date: 1962 - 1962
Plans of the German Tunnel at St Aubin - electrical layout
Reference: D/AL/A8/1(E4)
Date: 1978 - 1978
Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank - Contract No 520/2. Construction; Engineer's Weekly Reports; Shafts and Tunnels - File No 1
Reference: D/AL/C5/A/1/43
Date: July 25th 1994 - March 9th 1997
Tunnels; Site Record Book - Book One. Included in the file is loose correspondence relating to rock reinforcement, water levels and instrumentation readings
Reference: D/AL/C5/A/1/7/8
Date: 1994-11 - November 15th 1996
Database and Hard Copy of all Site Records issued from Site Record Books for Shafts and Tunnels and Cavern and Associated Works (1994-1996)
Reference: D/AL/C5/A/1/8
Date: 1994 - 1996
Fort Regent Cavern. Construction Phase 941101-D. Technical - Design Voume Eleven A. Performance Monitoring. File relates to correspondence about Geo-Engineering layouts, site developments and monitoring records from portals, tunnels, vent - control station, shafts and cavern. Correspondence includes work records, details of piezometers, extensometers and other instrumentation, cross section drawings, measurements and method statements.
Reference: D/AL/C5/D/12/15
Date: November 21st 1994 - April 10th 1995
Fort Regent Cavern. Construction Phase 941101-D. Technical - Design Voume Eleven B. Performance Monitoring. File relates to correspondence about Geo-Engineering layouts, site developments and monitoring records from portals, tunnels, vent - control station, shafts and cavern. Correspondence includes work records, details of piezometers, extensometers and other instrumentation, cross section drawings, measurements and method statements.
Reference: D/AL/C5/D/12/16
Date: April 11th 1995 - December 31st 1995
Fort Regent Cavern. Construction Phase 941101-D. Technical - Design Voume Eleven C. Performance Monitoring. File relates to correspondence about Geo-Engineering layouts, site developments and monitoring records from portals, tunnels, vent - control station, shafts and cavern. Correspondence includes work records, details of piezometers, extensometers and other instrumentation, cross section drawings, measurements, cabling, data logging and method statements.
Reference: D/AL/C5/D/12/17
Date: January 1st 1996 - May 22nd 1997
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Tunnels (Excavation Phase) - MAT to CH39, MAT CH39 to end, Turning Bay and Emergency Escape Adit. Volume Four. File includes well depth data, method statements, Balfour Beatty work records, site information requests and related correspondence.
Reference: D/AL/C5/D/12/32
Date: July 19th 1994 - November 16th 1994
Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Tunnels (Lining Phase). Volume Four. File includes correspondence about shotcrete trials, waterproofing, chainage, Balfour Beatty work records and related correspondence.
Reference: D/AL/C5/D/12/33
Date: February 7th 1995 - January 29th 1997
Weighbridge to Town Centre. St Helier Surface Water Link and Storage Tank Contract No 520/2. Tunnels Shaft 2 to Shaft 4. Balfour Beatty Shift Reports (Copies). Includes Tunnel Boring Machine daily record sheets relating to monitoring, commission and chamber lining works. Also includes DeMark allocation sheets
Reference: D/AL/C5/D/13/10
Date: July 13th 1995 - October 31st 1995
Search query time: 0.4218665 seconds • Page build time: 0.012862014770508 seconds