Digital copy of page 15 of Victoria Tansy Coupland's statement to the States of Jersey Police [in relation to Operation Rectangle]. Undated, c. 2008 onwards. [Some details redacted]. For Witness 347's witness statement to the States of Jersey Police dated 19 March 2008, see C/D/AW1/B1/2/1/31/WS000153.

Reference: C/D/AW1/A3/6/1/37/WD001896

Date: 2008 - 2014

Digital copy of Witness 347's witness statement to the States of Jersey Police providing an account of his experiences in care, primarily with reference to his time at Haut de la Garenne. Signature witnessed by Detective Constable [Philip] Kershaw. [Some details redacted].

Reference: C/D/AW1/B1/2/1/31/WS000153

Date: March 19th 2008 - March 19th 2008

Digital copy of Witness 360's witness statement to the States of Jersey Police providing an account of his experiences in the Jersey Sea Cadets. Signature witnessed by [Detective Sergeant] Keith Bray. [Some details redacted].

Reference: C/D/AW1/B1/2/1/41/WS000208

Date: December 4th 2007 - December 4th 2007

Digital copy of Witness 400's witness statement to the States of Jersey Police providing an account of his experiences in care, primarily with reference to his time at Haut de la Garenne. Signature witnessed by Detective Constable [Gina] Barclay. [Some details redacted].

Reference: C/D/AW1/B1/2/1/46/WS000273

Date: March 6th 2008 - March 6th 2008

Digital copy of a Report by Detective Sergeant David Hill detailing research on whether if there had been any disclosures about cellars or underground areas prior to a press release of 23 February 2008. Undated, c. 5 September 2009. [Some details redacted].

Reference: C/D/AW10/WD009185

Date: September 5th 2009 - September 5th 2009

Plans of German Tunnel near La Collette. Dated 1948.

Reference: D/AL/A4/1767

Date: 1948 - 1948

Plans of the German tunnels at the German Underground Hospital

Reference: D/AL/A6/2318/1(C5)

Date: 1962 - 1962

Plans of all the German tunnels

Reference: D/AL/A6/2336(C5)

Date: 1962 - 1962

Plans of the German Tunnel at St Aubin - electrical layout

Reference: D/AL/A8/1(E4)

Date: 1978 - 1978

Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank - Contract No 520/2. Construction; Engineer's Weekly Reports; Shafts and Tunnels - File No 1

Reference: D/AL/C5/A/1/43

Date: July 25th 1994 - March 9th 1997

Tunnels; Site Record Book - Book One. Included in the file is loose correspondence relating to rock reinforcement, water levels and instrumentation readings

Reference: D/AL/C5/A/1/7/8

Date: 1994-11 - November 15th 1996

Database and Hard Copy of all Site Records issued from Site Record Books for Shafts and Tunnels and Cavern and Associated Works (1994-1996)

Reference: D/AL/C5/A/1/8

Date: 1994 - 1996

Fort Regent Cavern. Construction Phase 941101-D. Technical - Design Voume Eleven A. Performance Monitoring. File relates to correspondence about Geo-Engineering layouts, site developments and monitoring records from portals, tunnels, vent - control station, shafts and cavern. Correspondence includes work records, details of piezometers, extensometers and other instrumentation, cross section drawings, measurements and method statements.

Reference: D/AL/C5/D/12/15

Date: November 21st 1994 - April 10th 1995

Fort Regent Cavern. Construction Phase 941101-D. Technical - Design Voume Eleven B. Performance Monitoring. File relates to correspondence about Geo-Engineering layouts, site developments and monitoring records from portals, tunnels, vent - control station, shafts and cavern. Correspondence includes work records, details of piezometers, extensometers and other instrumentation, cross section drawings, measurements and method statements.

Reference: D/AL/C5/D/12/16

Date: April 11th 1995 - December 31st 1995

Fort Regent Cavern. Construction Phase 941101-D. Technical - Design Voume Eleven C. Performance Monitoring. File relates to correspondence about Geo-Engineering layouts, site developments and monitoring records from portals, tunnels, vent - control station, shafts and cavern. Correspondence includes work records, details of piezometers, extensometers and other instrumentation, cross section drawings, measurements, cabling, data logging and method statements.

Reference: D/AL/C5/D/12/17

Date: January 1st 1996 - May 22nd 1997

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Tunnels (Excavation Phase) - MAT to CH39, MAT CH39 to end, Turning Bay and Emergency Escape Adit. Volume Four. File includes well depth data, method statements, Balfour Beatty work records, site information requests and related correspondence.

Reference: D/AL/C5/D/12/32

Date: July 19th 1994 - November 16th 1994

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Tunnels (Lining Phase). Volume Four. File includes correspondence about shotcrete trials, waterproofing, chainage, Balfour Beatty work records and related correspondence.

Reference: D/AL/C5/D/12/33

Date: February 7th 1995 - January 29th 1997

Weighbridge to Town Centre. St Helier Surface Water Link and Storage Tank Contract No 520/2. Tunnels Shaft 2 to Shaft 4. Balfour Beatty Shift Reports (Copies). Includes Tunnel Boring Machine daily record sheets relating to monitoring, commission and chamber lining works. Also includes DeMark allocation sheets

Reference: D/AL/C5/D/13/10

Date: July 13th 1995 - October 31st 1995