Notice concerning the introduction of metric measurement

Reference: B/A/W30/81

Date: February 27th 1942 - February 27th 1942

Fort Regent Cavern - Construction Phase. 941101-L. Construction - Contractual. Volume One (A) - General Correspondence. File includes correspondence relating to final measurement programmes, meeting notes, rates of works, additional works, claims, valuations, time and motion study, site instructions, disruptions and delays.

Reference: D/AL/C5/D/12/59

Date: May 6th 1994 - May 31st 1996

Fort Regent Cavern - Construction Phase. 941101-L. Construction - Contractual. Volume One (B) - General Correspondence. File includes correspondence relating to junction boxes, labour rates, meeting notes, bill submissions, measurement progress, defects, cross section drawings of the cavern, geological overbreak, claims, sectional completion, prolongation costs and contractual issues.

Reference: D/AL/C5/D/12/60

Date: June 12th 1996 - August 4th 1998

Surface Water Link and Storage Tank Contract No 520/2. Final Account Dimensions and Final Account Measurements. Sections 1-6. These sections relate to General Items, S1-S2, S2-S4, S1-S5, Shaft 1 and Shaft 2

Reference: D/AL/C5/E/18/12

Date: October 30th 1995 - 1998-10

Surface Water Link and Storage Tank Contract No 520/2. Final Account Dimensions and Final Account Measurements. Sections 9-12. These sections relate to Shaft 4, MHS5, S2-MHT.

Reference: D/AL/C5/E/18/13

Date: 1993-04 - September 3rd 1997

Surface Water Link and Storage Tank Contract No 520/2. Final Account Dimensions and Final Account Measurements. Sections 13-21

Reference: D/AL/C5/E/18/14

Date: November 21st 1996 - 1997-08

Surface Water Link and Storage Tank Contract No 520/2. Rock Reinforcement. File includes correspondence, work records and file notes relating to Rockbolts, Rock Reinforcement claim, support requirements and measurements.

Reference: D/AL/C5/E/18/18

Date: July 19th 1994 - May 30th 2001

Jersey Storm Water Project: Re-Measure of the Works. Balfour Beatty Measure Sheets removed, checked, copied etc and used elsewhere except thise inside. See notes on dividers regarding Shaft 1 and Shaft 4 - Revised. File includes drawings and final account measurements

Reference: D/AL/C5/E/18/21

Date: March 17th 1997 - September 7th 1997

Weighbridge to Town Centre, St Helier. Surface Water Link and Storage Tank. Contract 520/2. Copy of correspondence between Public Services Department and Balfour Beatty regarding Final Measurement of Works. CRC File No 1

Reference: D/AL/C5/E/18/22

Date: December 6th 1996 - November 12th 1998

Explanatory Notes for Budget Exercise - Projected Final Measurement Value with covering note.

Reference: D/AL/C5/H/22/11/3

Date: March 9th 1999 - March 11th 1999

Assessment of Delay, Prolongation relating to Main Access Tunnel, Tunnel S1-S2 and Main Holding Tank. File also includes paperwork titled critical events to cavern section and overall programme critical events.

Reference: D/AL/C5/H/22/11/4

Date: March 12th 1999 - March 16th 1999

Bundle of Copy documents relating to Balfour Beatty claim. File includes correspondence, drawings, reports and work records relating to; end wall supports, cabling, delays, overbreak infilling, concreting, measurements, main holding tank rock reinforcement, final accounts, addendum item submissions, cavern design, blasting data and general construction

Reference: D/AL/C5/K/24/12

Date: February 11th 1994 - November 20th 1999

File of copy drawings including; layouts, dimensions, setouts, surveys, electrical layouts, civil works, plans, pipework details, manholes, traffic diversion maps and specifications. File also includes drawing issue sheets and bar bending dimensions.

Reference: D/AL/C5/K/24/13

Date: 1993-05 - 1995-12

B0025 Jersey - Final Account. Measurement and Rates. Trials and Testing Instrumentation. Bill 1. Preliminaries from 1/1/16/0138-1/1/16/0150. File No M/01/05

Reference: D/AL/C5/N/26

Date: 1994 - 1998

B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; Bill Measure and Section Summary. File No M/02/01

Reference: D/AL/C5/N/27

Date: 1994 - 1998

B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; A I's 1-19. File No M/02/02

Reference: D/AL/C5/N/28

Date: 1994 - 1998

B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; A I's 20-39. File No M/02/03

Reference: D/AL/C5/N/29

Date: 1994 - 1997

B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; A I's 40-59. File No M/02/04

Reference: D/AL/C5/N/30

Date: 1994 - 1997

B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; A I's 60-66. File No M/02/05

Reference: D/AL/C5/N/31

Date: 1994 - 1997

B0025 Jersey - Final Account. Measurement and Rates. Bill 02. Tunnels S1-S4; A I's 67-72. File No M/02/06

Reference: D/AL/C5/N/32

Date: 1994 - 1998

Search query time: 0.6718633 seconds • Page build time: 0.044752498467763 seconds