States Assembly Hansard Official Report includes petitions, written questions, oral questions, questions without notice for the Minister for Home Affairs and the Chief Minister, statement regarding the implementation of the Williamson Plan and Budget Statement 2010 (P.179/2009) and amendments.

Reference: C/A12/193

Date: December 8th 2009 - December 8th 2009

States Assembly Hansard Official Report includes Budget Statement 2010 (P.179/2009) and amendments.

Reference: C/A12/194

Date: December 9th 2009 - December 9th 2009

States Assembly Hansard Official Report includes Budget Statement 2010 (P.179/2009) and amendments, Draft Finance (2010 Budget) (Jersey) Law 200- (P.180/2009), Draft Income Tax (Amendment No. 34) (Jersey) Law 200- (P.181/2009), Draft Goods and Services Tax (Amendment No. 2) (Jersey) Law 200- (P.182/2009), Draft Goods and Services Tax (Amendment) (Jersey) Regulations 200- (P.183/2009), Draft Taxation (Land Transactions) (Jersey) Law 2009 (Appointed Day) Act 200- (P.158/2009), Draft Taxation (Land Transactions) (Amendment of Law) (Jersey) Regulations 200- (P.159/2009), Draft Tariff of Harbour Dues (P.178/2009), ‘User Pays’ Charges: pathology (P.185/2009), Draft Health Insurance (Medical Benefit) (Amendment No. 2) (Jersey) Regulations 200- (P.184/2009), Rate Appeal Board: appointment of members (P.191/2009), Jersey Police Complaints Authority: appointment of members (P.192/2009), Public Employees Contributory Retirement Scheme Committee of Management: membership (P.199/2009), Jersey Appointments Commission: appointment of Chairman and member (P.200/2009), arrangement of public business for future meetings and Christmas greetings.

Reference: C/A12/195

Date: December 10th 2009 - December 10th 2009

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Portals. Volume Three. File includes correspondence about portals, method statements and related Balfour Beatty work records.

Reference: D/AL/C5/D/12/31

Date: May 16th 1994 - December 9th 1996

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Tunnels (Excavation Phase) - MAT to CH39, MAT CH39 to end, Turning Bay and Emergency Escape Adit. Volume Four. File includes well depth data, method statements, Balfour Beatty work records, site information requests and related correspondence.

Reference: D/AL/C5/D/12/32

Date: July 19th 1994 - November 16th 1994

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Tunnels (Lining Phase). Volume Four. File includes correspondence about shotcrete trials, waterproofing, chainage, Balfour Beatty work records and related correspondence.

Reference: D/AL/C5/D/12/33

Date: February 7th 1995 - January 29th 1997

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Vent-Control Stations (Lining Phase). Volume Five. File includes correspondence about shotcrete trials, waterproofing, ventilation, general construction and design issues, Balfour Beatty work records and related correspondence.

Reference: D/AL/C5/D/12/34

Date: August 19th 1994 - January 21st 1997

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Vent-Control Stations (Excavation Phase) - Pump and Control Room. Volume Five (I). File includes correspondence about installing units, excavation, profile drawings, method statements, Balfour Beatty work records and related correspondence.

Reference: D/AL/C5/D/12/35

Date: August 12th 1994 - April 6th 1995

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Vent-Control Stations (Excavation Phase) - Fan Room. Volume Five (II). File includes correspondence about shotcrete, half barrel records, structural issues, profiles, backfilling, method statements, Balfour Beatty work records, requests for information, stability assessments, rock bolt surveys, photographs of pad inspections and related correspondence and plans.

Reference: D/AL/C5/D/12/36

Date: February 16th 1995 - August 2nd 1995

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Cavern (Lining Phase). Volume Six. File includes correspondence about remedial works, repair works, site records, supply links, data logger data, outstanding work, relief pipes, crack injection, shotcrete, method statements and pipeworking between Balfour Beatty and Public Services Department and information on Zemdrain.

Reference: D/AL/C5/D/12/37

Date: December 14th 1995 - July 29th 1998

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Cavern 071-073 Stage One and Two. Volume Six (I). File includes correspondence about the cavern transition zone, Central Heading and Main Vault. Includes details of; overbreak records, surveys, drawings, method statements and ventilation as well as other general correspondence.

Reference: D/AL/C5/D/12/38

Date: October 17th 1994 - September 25th 1995

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Cavern 074-077 Stage Three; Sump (excavation phase). Volume Six (II). File includes correspondence about the Benches One to Three. Includes details of; work records, method statements, blasting, rock reinforcement units, layouts and drawings and locations of RRP's as well as other general correspondence.

Reference: D/AL/C5/D/12/39

Date: June 12th 1995 - December 21st 1995

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Shafts. Volume Seven. File includes correspondence relating to Access - Pump Shaft, Main Ventilation and the Escape Shaft. Correspondence includes; Balfour Beatty work records, temporary supports, site information requests, monorail installation, method statements, some cross section drawings and other general site correspondence.

Reference: D/AL/C5/D/12/40

Date: December 15th 1994 - November 14th 1995

Fort Regent Cavern - Construction Phase. 941101-E. Construction - Progress; Shafts (Lining Phase). Volume Seven. File includes correspondence relating to escape shaft enclosure, information requests, method statements, pump shaft lining, bar schedules, concreting, Sandberg report on microscopical examination of concrete samples, working hours, meva panel system plan and other general site correspondence.

Reference: D/AL/C5/D/12/41

Date: April 25th 1995 - February 24th 1997

Fort Regent Cavern - Construction Phase. 941101-L. Construction - Contractual. Volume Three (A) - Balfour Beatty Monthly Submission to No 16. File includes correspondence relating to valuation of monthly statements, materials and additional work schedules.

Reference: D/AL/C5/D/12/63

Date: August 26th 1994 - July 29th 1995

Fort Regent Cavern - Construction Phase. 941101-L. Construction - Contractual. Volume Three (A) - Balfour Beatty Monthly Submission from No 17 onwards. File includes correspondence relating to valuation of monthly statements, materials and additional work schedules.

Reference: D/AL/C5/D/12/64

Date: August 25th 1995 - February 9th 1996

File of correspondence relating to legal correspondence and documentation including Tunnel Boring Machine, Horizontal Raise Bore, Counsel advice and other claims and contracts. File also includes a draft witness statement from Edwin Frank Cooper and Merricks Solicitors notes [This file did not come with a reference - given next reference code in sequence]

Reference: D/AL/C5/G/20/56/6

Date: August 6th 1996 - November 10th 1997

File relating to Accident Claims. This is a file of correspondence concerning public liability claims relating to personal injury at Gorey Castle, this file includes insurance paperwork, statements recalling events, police reports and solicitors letters.

Reference: D/AL/D1/50/4/3

Date: 1973 - 1973

File relating to Accident Claims. This is a file of correspondence concerning claims relating to vehicles and properties, this file includes vehicle and building repair invoices and estimates, insurance documents and correspondence to and from the public.

Reference: D/AL/D1/50/4/4

Date: 1976 - 1976

File relating to Accident Claims. This is a file of correspondence concerning claims relating to vehicles, properties and personal injury, this file includes vehicle and building repair invoices and estimates, insurance documents and correspondence to and from the public.

Reference: D/AL/D1/50/4/5

Date: 1977 - 1977